Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
81 tokens/sec
Gemini 2.5 Pro Premium
47 tokens/sec
GPT-5 Medium
22 tokens/sec
GPT-5 High Premium
20 tokens/sec
GPT-4o
88 tokens/sec
DeepSeek R1 via Azure Premium
79 tokens/sec
GPT OSS 120B via Groq Premium
459 tokens/sec
Kimi K2 via Groq Premium
192 tokens/sec
2000 character limit reached

Dynamic Evaluation of Power Distribution Lines for Determining the Number of Repair Teams and Prioritizing the Resolution of Faults Caused by High-Impact Low-Probability Events (2105.10834v1)

Published 23 May 2021 in eess.SY, cs.SY, and eess.SP

Abstract: In order to increase the resilience of distribution systems against high-impact low-probability (HILP) events, it is important to prioritize the damaged assets so that the lost loads, especially critical and important loads, can be restored faster. In addition, correctly predicting the number of repair teams during critical times contributes to restoring the network to the initial resilience level. For this reason, this paper discusses the prioritization of electricity supply lines for evaluating the number of required repair teams. To this end, the economic value of distribution system lines has been considered as a criterion representing the sensitivity of the network to hurricanes. The modeling is based on value, in which the load value, failure probability of the poles, fragility curve, duration of line repair by the maintenance team, and the topology factor have been considered. This is so that the significance of the demand side, the failure extent and accessibility of the lines, the importance of time, and the network configuration are considered. The results provide a list of line priority for fault resolution, in which the topology factor has a larger effect. The number of repair teams required to restore critical and important loads is determined from this model. This modeling has been tested on an IEEE 33-bus network. Keywords: Resilience, distribution systems, asset evaluation, restoration prioritization, repair team

Citations (1)

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.