Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
89 tokens/sec
Gemini 2.5 Pro Premium
50 tokens/sec
GPT-5 Medium
29 tokens/sec
GPT-5 High Premium
28 tokens/sec
GPT-4o
90 tokens/sec
DeepSeek R1 via Azure Premium
55 tokens/sec
GPT OSS 120B via Groq Premium
468 tokens/sec
Kimi K2 via Groq Premium
207 tokens/sec
2000 character limit reached

Managing HILP Consequences Using Dynamic Distribution System Asset Assessment (2105.11455v1)

Published 23 May 2021 in eess.SY and cs.SY

Abstract: In order to increase the resilience of distribution systems against high-impact low-probability (HILP) events, it is important to prioritize assets damaged by these events so that the lost loads, especially sensitive and important loads, can be recovered faster. For this reason, this paper discusses the prioritization of electricity supply lines for scheduling and prioritizing repair actions. To this end, the economic value of distribution system lines has been considered as a criterion representing the sensitivity of the network to hurricanes. The modeling is based on value, in which the load value, lifetime-based failure probability of the poles, fragility curve, duration of line repair by the maintenance team, and the topology factor have been considered. This is so that the significance of the demand side, the failure extent and accessibility of the lines, the importance of time, and the network configuration are considered. The results provide an order of line priority for fault resolution, in which the topology factor has a larger effect. This modeling has been tested on an IEEE 33-bus network.

Citations (1)

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.