AICE signal and fibre-optic infrastructure requirements
Establish the detailed signal and optical-fibre requirements for the AICE shaft and surface laser laboratory, including their impact on existing infrastructure, cable-tray installation, and fibre-distribution planning.
References
A detailed assessment of the signal and optical fibre requirements required along the shaft and on the surface laboratory for the later installation of the AICE experiment is not yet available. Therefore, the impact on the existing infrastructure, the new required infrastructure (installation of cable trays, consolidation of the fibre distribution point in SX4 and UX45) and its related planning cannot yet be established.
— Technical Proposal for the Atom Interferometer CERN Experiment (AICE) Facility
(2608.18743 - Arduini et al., 19 Aug 2026) in Section 5, Subsection “Signal and fibre optic cabling”