Papers
Topics
Authors
Recent
2000 character limit reached

A hybrid heuristic algorithm for the resource-constrained project scheduling problem (2502.18330v1)

Published 25 Feb 2025 in math.OC

Abstract: This study presents a hybrid metaheuristic for the resource-constrained project scheduling problem (RCPSP), which integrates a genetic algorithm (GA) and a neighborhood search strategy (NS). The RCPSP consists of a set of activities that follow precedence relationship and consume resources. The resources are renewable, and the amount of the resources is limited. The objective of RCPSP is to find a schedule of the activities to minimize the project makespan. The algorithm uses two crossovers in the GA and two neighborhoods in the NS, as well as a resource ranking heuristic. The computational results with instances from the PCPLIB library validate the effectiveness of the proposed algorithm. We have obtained some of the best average deviations of the solutions from the critical path lower bound. The best heuristic solutions have been updated for some instances from PCPLIB.

Summary

We haven't generated a summary for this paper yet.

Slide Deck Streamline Icon: https://streamlinehq.com

Whiteboard

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

X Twitter Logo Streamline Icon: https://streamlinehq.com

Tweets

This paper has been mentioned in 1 tweet and received 1 like.

Upgrade to Pro to view all of the tweets about this paper: