Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
158 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Aggregator of Electric Vehicles Bidding in Nordic FCR-D Markets: A Chance-Constrained Program (2404.12818v4)

Published 19 Apr 2024 in eess.SY and cs.SY

Abstract: The Danish system operator, Energinet, has recently introduced an innovative grid code called the P90 requirement, which allows stochastic flexible resources to bid their flexibility in Nordic ancillary service markets, contingent upon a minimum 90% probability of successfully realizing the reserve capacity bid. For limited-energy resources, Energinet imposes additional requirements for participation in these markets. Given these requirements, this paper presents a chance-constrained optimization model designed for aggregators of electric vehicles, aiming to optimally place reserve capacity bids in the Nordic Frequency Containment Reserve for Disturbances (FCR-D) market while accounting for uncertainty in future consumption baselines. We analyze both FCR-D up and down markets, reformulating and solving the proposed joint chance-constrained model using two sample-based methods. Using real data from 1,400 charging stations in Denmark from March 2022 to March 2023, we demonstrate the out-of-sample profit potential. Our findings indicate that vehicle owners could save between 6% and 10% on their annual electricity bills by providing FCR-D services. Additionally, we observed a synergy effect, where having more vehicles in a single portfolio enables larger bids per vehicle compared to a collective bid from multiple portfolios with the same total number of vehicles.

Summary

We haven't generated a summary for this paper yet.

X Twitter Logo Streamline Icon: https://streamlinehq.com