Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
173 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
46 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Task Scheduling of Multiple Agile Satellites with Transition Time and Stereo Imaging Constraints (1912.00374v1)

Published 1 Dec 2019 in eess.SY and cs.SY

Abstract: This paper proposes a framework for scheduling the observation and download tasks of multiple agile satellites with practical considerations such as attitude transition time, onboard data capacity, and stereoscopic image acquisition. A mixed integer linear programming (MILP) formulation for optimal scheduling that can address these practical considerations is introduced. A heuristic algorithm to obtain a near-optimal solution of the formulated MILP based on the time windows pruning procedure is proposed. A comprehensive case study demonstrating the validity of the proposed formulation and heuristic is presented.

Citations (1)

Summary

We haven't generated a summary for this paper yet.