Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
149 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Post-disaster Repair Scheduling in Partially Automated Electricity Distribution Networks (1906.06461v1)

Published 15 Jun 2019 in math.OC, cs.SY, and eess.SY

Abstract: Natural disasters require repairing all damaged components in electricity distribution networks. Optimal scheduling repair crews to minimize the aggregate duration of interruptions reduces the harm. We consider the fact that the number of switches is much smaller than the number of edges. The problem is modeled by a parallel identical machine scheduling with group soft precedence constraints to minimize the total weighted energization time. We propose an LP-based list scheduling algorithm and a conversion algorithm and analyze their theoretical performances.

Citations (1)

Summary

We haven't generated a summary for this paper yet.