Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
125 tokens/sec
GPT-4o
10 tokens/sec
Gemini 2.5 Pro Pro
44 tokens/sec
o3 Pro
5 tokens/sec
GPT-4.1 Pro
3 tokens/sec
DeepSeek R1 via Azure Pro
51 tokens/sec
2000 character limit reached

Distillation and stripping pilot plants for the JUNO neutrino detector: design, operations and reliability (1902.05288v1)

Published 14 Feb 2019 in physics.ins-det

Abstract: This paper describes the design, construction principles and operations of the distillation and stripping pilot plants tested at the Daya Bay Neutrino Laboratory, with the perspective to adapt this processes, system cleanliness and leak-tightness to the final full scale plants that will be used for the purification of the liquid scintillator used in the JUNO neutrino detector. The main goal of these plants is to remove radio impurities from the liquid scintillator while increasing its optical attenuation length. Purification of liquid scintillator will be performed with a system combining alumina oxide, distillation, water extraction and steam (or N2 gas) stripping. Such a combined system will aim at obtaining a total attenuation length greater than 20 m at 430 nm, and a bulk radiopurity for 238U and 232Th in the 10-15 to 10-17 g/g range. The pilot plants commissioning and operation have also provided valuable information on the degree of reliability of their main components, which will be particularly useful for the design of the final full scale purification equipment for the JUNO liquid scintillator. This paper describe two of the five pilot plants since the Alumina Column, Fluor mixing and the Water Extraction plants are in charge of the Chinese part of the collaboration.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.