Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 91 tok/s
Gemini 2.5 Pro 52 tok/s Pro
GPT-5 Medium 15 tok/s Pro
GPT-5 High 19 tok/s Pro
GPT-4o 95 tok/s Pro
Kimi K2 214 tok/s Pro
GPT OSS 120B 466 tok/s Pro
Claude Sonnet 4 39 tok/s Pro
2000 character limit reached

Joint Optimization of Opportunistic Predictive Maintenance and Multi-location Spare Part Inventories for a Deteriorating System Considering Imperfect Actions (1810.06315v2)

Published 15 Oct 2018 in math.OC

Abstract: Considering the close interaction between spare parts logistics and maintenance planning, this paper presents a model for joint optimization of multi-location spare parts supply chain and condition-based maintenance under predictive and opportunistic approaches. Simultaneous use of the imperfect maintenance actions and innovative policy on spare part ordering, which is defined based on the deterioration characteristic of the system, is a significant contribution to the research. This paper also proposes the method to determine the inspection time which not only considers restraints of the both maintenance and spare parts provision policies, but also uses an event-driven approach in order to prevent unnecessary inspections. Defined decision variables such reliability, upper limit for spare parts order quantity, preventive maintenance threshold, re-ordering level of degradation, and the maximum level of successive imperfect actions will be optimized via stochastic Monte-Carlo simulation. The optimization follows two objectives: (1) system should reach the expected availability which helps decision makers apply the opportunistic approach (2) and cost rate function as an objective function must be minimized. To illustrate the use of the proposed model, a numerical example and its results finally is presented. Key words: maintenance, multi-location supply chain, spare parts inventory, imperfect maintenance, predictive inspection, opportunistic approach, availability, reliability

Summary

We haven't generated a summary for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

Don't miss out on important new AI/ML research

See which papers are being discussed right now on X, Reddit, and more:

“Emergent Mind helps me see which AI papers have caught fire online.”

Philip

Philip

Creator, AI Explained on YouTube