Papers
Topics
Authors
Recent
2000 character limit reached

The upgrade system of BESIII ETOF with MRPC technology (1604.02701v1)

Published 10 Apr 2016 in physics.ins-det and hep-ex

Abstract: The Beijing Spectrometer III (BESIII) endcap Time-Of-Filght (ETOF) was proposed to upgrade with Multigap Resistive Plate Chamber (MRPC) technology to substitute the current ETOF of scintillator+PMT for extending time resolutin better than 80 ps and enhance the particle identification capability to satisfy the higher precision requirement of physics. The ETOF system including MRPC modules, front end electronics (FEE), CLOCK module, fast control boards and time to digital modules (TDIG), has been designed, constructed and done some experimental tests seperately. Aiming at examining the quality of entire ETOF system and training the operation of all participated parts, a cosmic ray test system was built at the laboratory and underwent about three months to guarantee performance. In this paper the results will be presented indicating that the entire ETOF system works well and satisfies the requirements of the upgrade.

Citations (11)

Summary

We haven't generated a summary for this paper yet.

Whiteboard

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.