Electromagnetic Transient Model of Cryptocurrency Mining Loads for Low-Voltage Ride Through Assessment in Transmission Grids (2312.15067v1)

Published 22 Dec 2023 in eess.SY and cs.SY

Abstract: In this paper, we developed an Electromagnetic Transient (EMT) model tailored for large cryptocurrency mining loads to understand the cross-interaction of these loads with the electric grid. The load model has been built using Electromagnetic Transients Program (EMTP) software. We have cross-validated the performance of the EMT model of the load with commercial application-specific integrated circuit miners, typically used by large-scale mining facilities, by comparing their low-voltage ride-through (LVRT) capabilities. Subsequently, LVRT capabilities of the large-scale miners have been tested against various fault scenarios both within the miner's remote facility as well as at one of the distant buses of the interconnected grid. The significance of this model lies in its scalability to accommodate larger blocks of mining loads and its seamless integration into a larger electric grid.

Definition Search Book Streamline Icon: https://streamlinehq.com
References (16)
  1. Pablo Vegas, “Ercot public presentation: Item 5 : Ceo update - revised,” Published in 31, August 2023, [Online]. Available :  https://www.ercot.com/files/docs/2023/08/28/5%20CEO%20Update%20REVISED.pdf.
  2. Jason Brett, “Forbes: Texas poised to be a world leader in bitcoin and blockchain,” Published in Forbes 02, October 2021, [Online]. Available: https://www.forbes.com/sites/jasonbrett/2021/10/02/texas-poised-to-be-a-world-leader-in-bitcoin-and-blockchain/?sh=6e2db00a715b.
  3. Dan Woodfin, “Ercot public presentation: Item 7.2.1: Inverter based resource and large load ride through events: Background and mitigation,” Published in 19, June 2023, [Online]. Available: www.ercot.com.
  4. Agee Springer, Evan Rowe, Evan Neel, “Ercot public presentation: Ibrtf - lfl interconnection & resource adequacy,” Published in 05, April 2023, Texas A& M University.
  5. ERCOT IBRTF Meeting - NERC, “Reliability guidelines: Electromagnetic transient (emt) modeling for bps-connected inverter-based resources – requirements and verification practices & emt task force,” [Online] Available: https://www.ercot.com/files/docs/2023/01/20/RG-EMTModelingandSimulation-EMTTF-ERCOTIBRTF2023.pdf.
  6. “North america’s largest bitcoin mining facility by developed capacity,” [Online] Available: https://www.riotplatforms.com/bitcoin-mining/whinstone-u-s.
  7. Stephen Solis, “Ercot public presentation: Ibrtf - nogrr245 - inverter-based resource (ibr) ride-through requirements,” Published in 20, January 2023, [Online]. Available : https://www.ercot.com/files/docs/2023/01/20/NOGRR245%20IRR%20Ride%20Through%20Requirements_IBRTF_01202023.pptx.
  8. “Ercot public presentation:large load interconnection status,” Published in 17, February 2023,  [Online]. Available :  https://www.ercot.com/files/docs/2023/02/17/LLI%20Queue%20Status%20Update%20-%202023-02-17.pdf.
  9. K. A. Wheeler, A. W. Bowers, C. H. Wong, J. Y. Palmer, and X. Wang, “A power quality and load analysis of a cryptocurrency mine,” in 2018 IEEE Electrical Power and Energy Conference (EPEC).   IEEE, 2018, pp. 1–6.
  10. S. Almubarak, H. Ibrahim, D. Singhania, and P. Enjeti, “Energy consumption & power quality in bitcoin mining facilities in texas,” in 2023 IEEE Energy Conversion Conference and Expo, 2023, pp. 1–5.
  11. P. Harinath, K. Kamaleswaran, M. Venkateshwaran, C. Sreenath, S. Prabhakaran, and V. Kirubakaran, “A critical analysis of power quality issues in data center,” in 2016 Biennial International Conference on Power and Energy Systems: Towards Sustainable Energy (PESTSE).   IEEE, 2016, pp. 1–6.
  12. K. R. Raguž, M. Miletić, V. Zeleničić, D. Sumina, I. Erceg, and Z. Nastasić, “Analysis of current harmonics in data center power system,” in 2022 45th Jubilee International Convention on Information, Communication and Electronic Technology (MIPRO), 2022, pp. 153–157.
  13. S. Mohan, S. Maleki, M. Shirinzad, B. Yancey, H. Trahan, and R. Ayass, “Load modeling impact on system stability and guidelines for stability studies on an islanded system with grid-forming inverters,” 2023, pp. 1–5.
  14. “Zeus Mining Crypto Mining Pro: Antminer APW8 Power Supply Repair Guide [EN],” Published in 27, July 2010, [Online]. Available: https://www.zeusbtc.com/manuals/Antminer-APW8-Power-Supply-Repair-Guide.asp.
  15. J. Prakash and I. Sarkar, “Comparison of PFC Converter Topology for Electric Vehicle Battery Charger Application,” in 2022 IEEE Students Conference on Engineering and Systems (SCES), 2022, pp. 1–6.
  16. U. Karaagac, H. Ashourian, I. Kocar, A. Stepanov, H. Gras, and J. Mahseredjian, “PV Park Models in EMTP,” Published in 10, June 2021, Available: https://emtp.com/documents/EMTP%20Documentation/doc/devices-2022/Renewables/PV_Park_Models.pdf, Tech. Rep., 2021.