Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
184 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Controllable Transmission Networks under Demand Uncertainty with Modular FACTS (2105.10402v1)

Published 1 Mar 2021 in eess.SP, cs.SY, and eess.SY

Abstract: The transmission system operators (TSOs) are responsible to provide secure and efficient access to the transmission system for all stakeholders. This task is gradually getting challenging due to the demand growth, demand uncertainty, rapid changes in generation mix, and market policies. Traditionally, the TSOs try to maximize the technical performance of the transmission network via building new overhead lines or physical hardening. However, obtaining public acceptance for building new lines is not an easy step in this procedure. For this reason, the TSOs try to capture the capabilities of existing assets. This paper investigates the use of modular FACTS devices (to alter the line characteristics) for improving the capability of transmission network in serving the uncertain demand without the need for building new overhead lines. The proposed method considers the uncertainty of demands and controls the utilization of existing transmission assets. The mathematical results obtained are validated with a complete non-linear simulation model of three transmission networks.

Citations (11)

Summary

We haven't generated a summary for this paper yet.