2000 character limit reached
PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements (1704.08744v1)
Published 27 Apr 2017 in physics.acc-ph
Abstract: The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Collections
Sign up for free to add this paper to one or more collections.