Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 63 tok/s
Gemini 2.5 Pro 49 tok/s Pro
GPT-5 Medium 11 tok/s Pro
GPT-5 High 10 tok/s Pro
GPT-4o 83 tok/s Pro
Kimi K2 139 tok/s Pro
GPT OSS 120B 438 tok/s Pro
Claude Sonnet 4 38 tok/s Pro
2000 character limit reached

Conceptual Design Report of Super Tau-Charm Facility: The Accelerator (2509.11522v1)

Published 15 Sep 2025 in physics.acc-ph and hep-ex

Abstract: Electron-positron colliders operating in the GeV region of center-of-mass energies or the Tau-Charm energy region, have been proven to enable competitive frontier research, due to its several unique features. With the progress of high energy physics in the last two decades, a new-generation Tau-Charm factory, Super Tau Charm Facility (STCF) has been actively promoting by the particle physics community in China. STCF holds great potential to address fundamental questions such as the essence of color confinement and the matter-antimatter asymmetry in the universe in the next decades. The main design goals of STCF are with a center-of-mass energy ranging from 2 to 7 GeV and a peak luminosity surpassing 5*1034 cm-2s-1 that is optimized at a center-of-mass energy of 4 GeV, which is about 50 times that of the currently operating Tau-Charm factory - BEPCII. The STCF accelerator is composed of two main parts: a double-ring collider with the crab-waist collision scheme and an injector that provides top-up injections for both electron and positron beams. As a typical third-generation electron-positron circular collider, the STCF accelerator faces many challenges in both accelerator physics and technology. In this paper, the conceptual design of the STCF accelerator complex is presented, including the ongoing efforts and plans for technological R&D, as well as the required infrastructure. The STCF project aims to secure support from the Chinese central government for its construction during the 15th Five-Year Plan (2026-2030) in China.

Summary

We haven't generated a summary for this paper yet.

Lightbulb On Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

X Twitter Logo Streamline Icon: https://streamlinehq.com

Tweets

This paper has been mentioned in 1 post and received 0 likes.