Papers
Topics
Authors
Recent
Search
2000 character limit reached

Globally Optimal AC Power System Upgrade Planning under Operational Policy Constraints

Published 17 Sep 2018 in math.OC | (1809.06125v1)

Abstract: In order to accommodate the increasing amounts of renewable generation in power distribution systems, system operators are facing the problem of how to upgrade transmission capacities. Since line and transformer upgrades are costly, optimization procedures are used to find the minimal number of up- grades required. The resulting design optimization formulations are generally mixed-integer non-convex problems. Traditional approaches to solving them are usually of a heuristic nature, yielding no bounds on suboptimality or even termination. In contrast, this work combines heuristics, lower-bounding pro- cedures and practical operational policy constraints. The resulting algorithm finds both suboptimal solutions quickly and the global solution determinis- tically by a Branch-and-Bound procedure augmented with lazy cuts.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.