2000 character limit reached
Approximating Scheduling Machines with Capacity Constraints (0906.3056v1)
Published 17 Jun 2009 in cs.DS
Abstract: In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most m_i jobs. M jobs are also given, where job j has a non-negative processing time length t_j >= 0. The task is to find a schedule such that the makespan is minimized and the capacity constraints are met. In this paper, we present a 3-approximation algorithm using an extension of Iterative Rounding Method introduced by Jain. To the best of the authors' knowledge, this is the first attempt to apply Iterative Rounding Method to scheduling problem with capacity constraints.
Sponsor
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.