2000 character limit reached
Analysis Paralysis: when to stop?
Published 29 Mar 2009 in cs.SE | (0903.5024v1)
Abstract: Analysis of a system constitutes the most important aspect of the systems development life cycle.But it is also the most confusing and time consuming of all the stages.The critical question always remains: How much and till when to analyse? Ed Yourdon has called this phenomenon as Analysis Paralysis. In this paper, I suggest a model which can actually help in arriving at a satisfactory answer to this problem.
Paper Prompts
Sign up for free to create and run prompts on this paper.