Determine whether selected multipliers degenerate when the joint qualification condition fails
Determine whether the multipliers selected through the first-mesh-cell construction for the free-time controlled sweeping problem can degenerate when the joint positive linear independence condition (JQ_0) fails.
References
It is open whether, in some problem where (JQ$_0$) fails, the multipliers built from Lemma~\ref{lem:first-cell} can have this form.
— Optimal Control of Prox-Regular Sweeping Processes with Variable Time
(2610.13327 - Cao et al., 9 Oct 2026) in Remark on the role of (JQ_0), Section 9b; Conclusions and Future Research, Section 8