Evidence-Governed Deployment Readiness for Networked Agents on Industrial OT Infrastructure
Abstract: Deploying a workload on a cyber-secure industrial operational-technology (OT) network requires many cross-layer prerequisites to hold at once, including persistent addressing, name resolution, time synchronization, certificate trust, proxy traversal, and reachable industrial-protocol endpoints. These are owned by different teams, yet current tools treat pre-deployment checking, fault attribution, remediation, and ongoing compliance as separate problems, so evidence is rarely reused across stages. As edge platforms come to host self-adapting agents on shared infrastructure, this fragmentation becomes a governance problem. All four stages ask one question: do a workload's requirements hold on a given network? We present an evidence-governed framework that answers it through a single reference, a versioned network-intent artifact specifying a workload's cross-layer requirements for a specific release. A coverage-driven test loop attaches tested evidence to each requirement before deployment. At a site, readiness is reported as ready, not ready, or undecidable, separating untested requirements from genuine failures; a repair step proposes fixes that preserve co-located workloads; and a drift-watch component re-evaluates the site on change, extending assurance across the workload's lifetime. A multi-workload OPC UA commissioning case illustrates all four stages. By detecting runtime deviations and suspending an agent's guarantees until a refreshed artifact is registered, the framework grounds auditable governance for adapting agent collectives on shared industrial infrastructure.
Paper Prompts
Sign up for free to create and run prompts on this paper.