Papers
Topics
Authors
Recent
Search
2000 character limit reached

Graph Scheduling with Group Completion Times

Published 30 Jun 2026 in cs.DS and math.OC | (2606.31530v1)

Abstract: In the Graph Scheduling problem we schedule a given multiset of edges on discrete time steps, such that at each step the set of edges forms a matching. The goal is to minimize the sum of weighted group completion times, where a group is a set of edges and it completes when the last edge has been scheduled. Two popular variants of this problem are Coflow Scheduling and Data Migration. Our main result is extending a recent iterated rounding approach from Coflow Scheduling, roughly corresponding to the bipartite case, to the general Graph Scheduling problem. This yields an essentially tight $(2+ε)$-approximation for the asymptotic setting where OPT is assumed to be large. For this we rely on polyhedral techniques from general matching, namely odd-set inequalities, and graph theoretical results on edge colorings in multigraphs. The state-of-the-art approximation algorithm for Data Migration is a $(1 + φ)$-approximation that improves when OPT is small. Taking the best of this and our main result, we obtain an improvement of the approximation rate for Data Migration in any regime.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.