Papers
Topics
Authors
Recent
Search
2000 character limit reached

Capacity Expansion Planning for Puerto Rico's Electric Power System

Published 21 Apr 2026 in math.OC and eess.SY | (2604.18926v1)

Abstract: This study presents a mathematical optimization framework and preliminary analysis for long-term investment planning in Puerto Rico's electric power system. We develop a high-resolution capacity expansion model to identify least-cost generation and storage investments that improve system reliability. The model co-optimizes new investments and thermal generator retirements while representing generator dispatch, unit commitment, fuel selection, and storage operations under constraints of equipment engineering limits, fuel supply limitations, and load satisfaction. Key methodological advances relative to prior long-term planning studies for Puerto Rico include: (i) nodal transmission modeling at 38 kV and above, (ii) hourly chronological operations for representative days, (iii) explicit unit commitment for existing and new thermal units with realistic ramping, minimum up and down times, and startup costs, (iv) system-wide fuel supply constraints, and (v) stochastic operating scenarios reflecting load variation, renewable availability, and the high forced outage rates of legacy units. Using data from LUMA, PREPA, DOE, and public sources, we build present-day (2024) and future (2030) test systems, with the latter including planned generation and storage projects. We evaluate planning scenarios that vary future load, fuel supply assumptions, realization of planned expansion, and allowable new technologies. Results show that, given the recent relaxation of interim renewable goals for the near future in Puerto Rico, an optimal portfolio includes at least 1.5 GW of new H-class combined cycle capacity beyond planned projects. These additions are needed mainly to replace unreliable legacy thermal units rather than to serve new load. The new combined cycle units eliminate modeled bulk-system load shedding and restore a strong reserve margin, even under stressed load and outage conditions.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 0 likes about this paper.