Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 160 tok/s
Gemini 2.5 Pro 49 tok/s Pro
GPT-5 Medium 39 tok/s Pro
GPT-5 High 28 tok/s Pro
GPT-4o 98 tok/s Pro
Kimi K2 196 tok/s Pro
GPT OSS 120B 437 tok/s Pro
Claude Sonnet 4.5 38 tok/s Pro
2000 character limit reached

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab (2509.18392v1)

Published 22 Sep 2025 in hep-ex

Abstract: This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, USA. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m3 each. The detector uses liquid argon both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground laboratory, in a 3 year duration run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams, at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment, have been completely re-designed and rebuild, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the Icarus Collaboration. Design, installation, testing, commissioning and operation is the result of a common effort of CERN, Fermilab and INFN Groups.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.