Papers
Topics
Authors
Recent
2000 character limit reached

Integrating Upstream Supply Chains into Generation Expansion Planning (2508.03001v1)

Published 5 Aug 2025 in eess.SY and cs.SY

Abstract: Rising electricity demand underscores the need for secure and reliable generation expansion planning that accounts for upstream supply chain constraints. Traditional models often overlook limitations in materials, manufacturing capacity, lead times for deployment, and field availability, which can delay availability of planned resources and thus to threaten system reliability. This paper introduces a multi-stage supply chain-constrained generation expansion planning (SC-GEP) model that optimizes long-term investments while capturing material availability, production limits, spatial and temporal constraints, and material reuse from retired assets. A decomposition algorithm efficiently solves the resulting MILP. A Maryland case study shows that supply chain constraints shift technology choices, amplify deployment delays caused by lead times, and prompt earlier investment in shorter lead-time, low-material-intensity options. In the low-demand scenario, supply chain constraints raise investment costs by $1.2 billion. Under high demand, persistent generation and reserve shortfalls emerge, underscoring the need to integrate upstream constraints into long-term planning.

Summary

We haven't generated a summary for this paper yet.

Whiteboard

Paper to Video (Beta)

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.