Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash 92 tok/s
Gemini 2.5 Pro 49 tok/s Pro
GPT-5 Medium 32 tok/s
GPT-5 High 40 tok/s Pro
GPT-4o 83 tok/s
GPT OSS 120B 467 tok/s Pro
Kimi K2 197 tok/s Pro
2000 character limit reached

Computing an optimal single machine schedule with sequence dependent setup times using shortest path computations (2507.20611v1)

Published 28 Jul 2025 in math.OC

Abstract: We study a single-machine scheduling problem with sequence dependent setup times, motivated by applications in manufacturing and service industries - in particular, the calendering stage in rubber flooring production. In this phase, setup times are primarily driven by temperature and color transitions between consecutive jobs, with significant impact on throughput and energy efficiency. We present a novel solution framework that transforms the scheduling problem into a path-finding problem on a specially constructed layered graph. By encoding sequence-dependent effects directly into the graph's structure, we enable the use of classical shortest-path algorithms to compute optimal job sequences. The resulting method is polynomial-time solvable for the two-color case and reveals key structural properties of optimal schedules. Our approach thus provides both a theoretically grounded and practically applicable optimization technique.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.