Papers
Topics
Authors
Recent
Search
2000 character limit reached

Optimal Scheduling of a Dual-Arm Robot for Efficient Strawberry Harvesting in Plant Factories

Published 6 Jul 2025 in cs.RO | (2507.04240v1)

Abstract: Plant factory cultivation is widely recognized for its ability to optimize resource use and boost crop yields. To further increase the efficiency in these environments, we propose a mixed-integer linear programming (MILP) framework that systematically schedules and coordinates dual-arm harvesting tasks, minimizing the overall harvesting makespan based on pre-mapped fruit locations. Specifically, we focus on a specialized dual-arm harvesting robot and employ pose coverage analysis of its end effector to maximize picking reachability. Additionally, we compare the performance of the dual-arm configuration with that of a single-arm vehicle, demonstrating that the dual-arm system can nearly double efficiency when fruit densities are roughly equal on both sides. Extensive simulations show a 10-20% increase in throughput and a significant reduction in the number of stops compared to non-optimized methods. These results underscore the advantages of an optimal scheduling approach in improving the scalability and efficiency of robotic harvesting in plant factories.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.