Papers
Topics
Authors
Recent
2000 character limit reached

Impact of particle production mechanisms on pseudorapidity distribution and directed flow in Au+Au and Cu+Cu collisions at $\sqrt{s_{NN}}$ = 19.6 GeV using AMPT model (2506.12114v1)

Published 13 Jun 2025 in nucl-th, hep-ex, hep-ph, and nucl-ex

Abstract: The STAR experiment at the top RHIC energy has observed that the directed flow ($v_1$) of inclusive light hadrons is independent of the collision system size at a given centrality~\cite{STAR:2008jgm}. However, recent STAR measurements indicate a system-size dependence in the $v_1(y)$-slope ($dv_{1}/dy$) of protons, antiprotons, and their differences ($\Delta dv_{1}/dy$) at a given centrality, suggesting a potential influence of baryon production and transport mechanisms~\cite{Taseer:SQM2024talk}. We have studied pseudorapidity ($dN/dy$) distributions and directed flow ($v_1$ and $dv_{1}/dy$) for pions, kaons, and protons in Au+Au and Cu+Cu collisions at $\sqrt{s_{NN}} = 19.6$ GeV using the A Multi-Phase Transport (AMPT) model. Specifically, we investigated the influence of string junction parameters in AMPT via the PYTHIA/JETSET routines, focusing on the popcorn mechanism and string-splitting parameters, on $dN/dy$, $dv_{1}/dy$, and their charge-dependent splittings ($\Delta dN/dy$ and $\Delta dv_{1}/dy$). We observe that string junction parameters can affect $dN/dy$, $dv_{1}/dy$, $\Delta dN/dy$, and $\Delta dv_{1}/dy$ for $\pi$, K, and p, and influence their system-size dependence. The effect is most prominent on the $v_1$ of protons, non-trivial for kaons, while the pions $v_1$ remain largely unchanged. These findings provide insights into the interplay between particle production mechanisms, baryon transport, and directed flow in heavy-ion collisions.

Summary

We haven't generated a summary for this paper yet.

Slide Deck Streamline Icon: https://streamlinehq.com

Whiteboard

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

X Twitter Logo Streamline Icon: https://streamlinehq.com

Tweets

This paper has been mentioned in 1 tweet and received 0 likes.

Upgrade to Pro to view all of the tweets about this paper: