Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash 94 tok/s
Gemini 2.5 Pro 46 tok/s Pro
GPT-5 Medium 28 tok/s
GPT-5 High 30 tok/s Pro
GPT-4o 91 tok/s
GPT OSS 120B 454 tok/s Pro
Kimi K2 212 tok/s Pro
2000 character limit reached

A Risk-Based Probabilistic Transient Stability Approach for Ranking of Circuit Breakers in a Power System (2505.15374v1)

Published 21 May 2025 in eess.SY and cs.SY

Abstract: Power systems are getting more complex than ever and are consequently operating close to their limit of stability. Moreover, with the increasing demand of renewable wind generation, and the requirement to maintain a secure power system, the importance of transient stability cannot be overestimated. Current deterministic industry practices of transient stability assessment ignore the probability of variables involved. With increasing system uncertainties and widespread electricity market deregulation, there is a strong inevitability to incorporate probabilistic transient stability analysis. Circuit breakers play a critical role in fault clearing and consequently in determining the system transient stability. It is important that they undergo timely and appropriate maintenance procedures based on some criterion. Considering the need of incorporating risk in modern power systems, this paper proposes a risk-based probabilistic transient stability approach for ranking of circuit breakers in a power system. A novel priority index was proposed to rank the circuit breakers based on the system transient stability risk. DIgSILENT PowerFactory software was used to conduct the required simulations on IEEE 14 bus system. The proposed risk-based framework was deemed to be efficient in identification of the circuit breakers based on their priority rank index which can aid in power system planning process.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.

Authors (1)