Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 69 tok/s
Gemini 2.5 Pro 39 tok/s Pro
GPT-5 Medium 35 tok/s Pro
GPT-5 High 37 tok/s Pro
GPT-4o 103 tok/s Pro
Kimi K2 209 tok/s Pro
GPT OSS 120B 457 tok/s Pro
Claude Sonnet 4.5 34 tok/s Pro
2000 character limit reached

Intent-driven scheduling of backup jobs (2501.14763v1)

Published 25 Dec 2024 in cs.DC and cs.PF

Abstract: Job scheduling under various constraints to achieve global optimization is a well-studied problem. However, in scenarios that involve time-dependent constraints, such as scheduling backup jobs, achieving global optimization may not always be desirable. This paper presents a framework for scheduling new backup jobs in the presence of existing job schedules, focusing on satisfying intent-based constraints without disrupting current schedules. The proposed method accommodates various scheduling intents and constraints, and its effectiveness is validated through extensive testing against a variety of backup scenarios on real-world data from Veritas Netbackup customer policies.

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

X Twitter Logo Streamline Icon: https://streamlinehq.com

Tweets

This paper has been mentioned in 1 post and received 0 likes.

Don't miss out on important new AI/ML research

See which papers are being discussed right now on X, Reddit, and more:

“Emergent Mind helps me see which AI papers have caught fire online.”

Philip

Philip

Creator, AI Explained on YouTube