Abstract: Hydro-Quebec (HQ) is a vertically integrated utility that produces, transmits, and distributes most of the electricity in the province of Quebec. The power grid it operates has a particular architecture created by large hydroelectric dams located far north and the extensive 735kV transmission grid that allows the generated power to reach the majority of the load located thousands of kilometers away in the southern region of Quebec. The specificity of the grid has led HQ to develop monitoring tools responsible for generating so-called stability limits. Those stability limits take into account several nonlinear phenomena such as angular stability, frequency stability, or voltage stability. Since generation planning and operation tools rely mostly on mixed integer linear programming formulation, HQ had to adapt its tools to integrate stability limits into them. This paper presents the challenges it faced, especially considering its reserve monitoring tool and unit commitment tool.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.