Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 134 tok/s
Gemini 2.5 Pro 44 tok/s Pro
GPT-5 Medium 20 tok/s Pro
GPT-5 High 31 tok/s Pro
GPT-4o 100 tok/s Pro
Kimi K2 177 tok/s Pro
GPT OSS 120B 434 tok/s Pro
Claude Sonnet 4.5 36 tok/s Pro
2000 character limit reached

Performance evaluation of electron multiplier tubes as a high-intensity muon beam monitor of accelerator neutrino experiments (2405.05877v3)

Published 9 May 2024 in physics.ins-det

Abstract: Upgrade work towards increasing the beam intensity of the neutrino beamline at J- PARC is underway. Monitoring tertiary muon beams is essential for stable operation of the beamline. Accordingly, we plan to replace the present muon monitor sensors with electron multiplier tubes (EMTs). We investigated the radiation tolerance and linearity response of EMTs using a 90 MeV electron beam. An EMTs was irradiated with electrons up to 470 nC. EMTs show higher radiation tolerance than the Si sensors which are presently used as one of the muon monitor detectors for the T2K long-baseline neutrino experiment at J-PARC. The integrated charge yield decrease is found to be less than 8% after a beam irradiation equivalent to 132 days of operation at the future J-PARC beam power of 1.3 MW. The EMTs show linearity better than $\pm$5% up to the future beam intensity. The observed yield decrease is likely due to dynode deterioration based on the detailed investigation. The studies described here confirm that EMTs can be used as a high-intensity muon beam monitor. From the reported results, we are proceeding with the installation in the J-PARC neutrino beamline.

Summary

We haven't generated a summary for this paper yet.

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.