Papers
Topics
Authors
Recent
Assistant
AI Research Assistant
Well-researched responses based on relevant abstracts and paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses.
Gemini 2.5 Flash
Gemini 2.5 Flash 69 tok/s
Gemini 2.5 Pro 52 tok/s Pro
GPT-5 Medium 37 tok/s Pro
GPT-5 High 28 tok/s Pro
GPT-4o 119 tok/s Pro
Kimi K2 218 tok/s Pro
GPT OSS 120B 456 tok/s Pro
Claude Sonnet 4.5 33 tok/s Pro
2000 character limit reached

Modeling liquefaction-induced runout of a tailings dam using a hybrid finite element and material point method approach (2404.15860v1)

Published 24 Apr 2024 in physics.geo-ph

Abstract: Tailings dams impound large amounts of saturated soil which can be highly susceptible to liquefaction. Liquefaction results in a severe loss of strength in the retained soil and potentially failure of the dam. If the dam is breached, a massive debris flow of liquefied soil is then released with potentially disastrous consequences downstream. Numerical models are frequently utilized to predict the liquefaction response of tailings dams and the potential runout, and these analyses inform engineering decisions regarding hazard avoidance and mitigation. The Finite Element Method (FEM) is a widespread tool which excels at modeling liquefaction triggering and initial movements, but it quickly loses accuracy when modeling large deformations due to mesh distortion. Conversely, the Material Point Method (MPM), a hybrid Eulerian-Lagrangian method, employs particles that move freely across a background grid and can account for large deformations without losing accuracy. However, issues with the accuracy of MPM's stress distributions and limits associated with the available boundary conditions impair its ability to predict liquefaction initiation. In this paper, we utilize a sequential hybridization of the FEM and MPM methods as a superior alternative to either individually. To demonstrate the efficacy of this hybrid method to simulate the entire process of tailings dam failures from initiation to runout, we model the 1978 Mochikoshi Tailings Dam failure.

Summary

We haven't generated a summary for this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.