Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
156 tokens/sec
GPT-4o
7 tokens/sec
Gemini 2.5 Pro Pro
45 tokens/sec
o3 Pro
4 tokens/sec
GPT-4.1 Pro
38 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

A hybrid metaheuristic to optimize electric first-mile feeder services with charging synchronization constraints and customer rejections (2401.03838v2)

Published 8 Jan 2024 in math.OC

Abstract: This paper addresses the on-demand meeting-point-based feeder electric bus routing and charging scheduling problem under charging synchronization constraints. The problem considered exhibits the structure of the location routing problem, which is more difficult to solve than many electric vehicle routing problems with capacitated charging stations. We propose to model the problem using a mixed-integer linear programming approach based on a layered graph structure. An efficient hybrid metaheuristic solution algorithm is proposed. A mixture of random and greedy partial charging scheduling strategies is used to find feasible charging schedules under the synchronization constraints. The algorithm is tested on instances with up to 100 customers and 49 bus stops/meeting points. The results show that the proposed algorithm provides near-optimal solutions within less one minute on average compared with the best solutions found by a mixed-integer linear programming solver set with a 4-hour computation time limit. A case study on a larger sized case with 1000 customers and 111 meeting points shows the proposed method is applicable to real-world situations.

Citations (3)

Summary

We haven't generated a summary for this paper yet.

X Twitter Logo Streamline Icon: https://streamlinehq.com