Fermilab Main Injector and Recycler Operations in the Megawatt Era (2310.02085v1)
Abstract: Significant upgrades to Fermilab's accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the NuMI (Neutrinos at the Main Injector) beam for the first time this year through changes to the Recycler slip-stacking procedure and shortening of the Main Injector ramp time. The modifications to the Recycler slip-stacking and efforts to reduce the duration of the Main Injector ramp will be discussed. Additionally, details regarding further shortening of the ramp time and the subsequent impacts on future accelerator operations are presented.
Collections
Sign up for free to add this paper to one or more collections.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.