Papers
Topics
Authors
Recent
2000 character limit reached

Approximation algorithm for resource-constrained project scheduling problems with net present value objective (2209.02029v1)

Published 5 Sep 2022 in math.OC

Abstract: Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test instances are limited to problems with less than 300 jobs, far from the thousands present in real-life scenarios. Furthermore, the RCPSP with discounted cost (DC) is critical in many of these settings, which require decision makers to evaluate the net present value of the finished tasks, but the non-linear cost function makes the problem harder to solve or analyze. In this work, we propose a novel approximation algorithm for the RCPSP-DC. Our main contribution is that, through the use of geometrically increasing intervals, we can construct an approximation algorithm, keeping track of precedence constraints, usage of multiple resources, and time requirements. To our knowledge, this is the first approximation algorithm for this problem. Finally, through experimental analysis over real instances, we report the empirical performance of our approach, showing that our technique allows us to solve sizeable underground mining problems within reasonable time frames and gaps much smaller than the theoretically computed ones.

Summary

We haven't generated a summary for this paper yet.

Slide Deck Streamline Icon: https://streamlinehq.com

Whiteboard

Dice Question Streamline Icon: https://streamlinehq.com

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Lightbulb Streamline Icon: https://streamlinehq.com

Continue Learning

We haven't generated follow-up questions for this paper yet.

List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.