Papers
Topics
Authors
Recent
Search
2000 character limit reached

PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac

Published 15 Mar 2022 in hep-ex | (2203.08079v2)

Abstract: The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Designs for proton accumulator rings are being studied to bunch the PIP-II protons into the short pulses needed for neutrino and low-mass dark matter experiments. PIP2-BD is a proposed 100-ton LAr scintillation-only experiment, whose detector design is inspired by CENNS-10 and CCM, that would have world-leading sensitivities to BSM physics, including low-mass dark matter produced in the PIP-II proton beam dump.

Citations (15)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.