Papers
Topics
Authors
Recent
Search
2000 character limit reached

Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS Phase-2 Muon System Upgrade

Published 30 Oct 2021 in physics.ins-det | (2111.00304v1)

Abstract: The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM Collaboration.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.