Papers
Topics
Authors
Recent
Search
2000 character limit reached

Prototype Design of a Timing and Fast Control system in the CBM Experiment

Published 25 Oct 2021 in physics.ins-det | (2110.12738v2)

Abstract: The Compressed Baryonic Matter (CBM) experiment is designed to handle interaction rates of up to 10 MHz and up to 1 TB/s of raw data generated. With triggerless streaming data acquisition in the experiment and beam intensity fluctuations, it is expected that occasional data bursts will surpass bandwidth capabilities of the Data Acquisition System (DAQ) system. In order to preserve integrity of event data, the bandwidth of DAQ must be throttled in an organised way with minimum information loss. The Timing and Fast Control (TFC) system provides a latency-optimised datapath for throttling commands and distributes a system clock together with a global timestamp. This paper describes a prototype design of the system with focus on synchronisation and its evaluation.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.