Papers
Topics
Authors
Recent
Search
2000 character limit reached

Aggregating Buildings as Virtual Power Plant: Architecture, Implementation Technologies, and Case Studies

Published 13 Apr 2020 in eess.SP | (2004.05807v1)

Abstract: The prevalence of distributed generation drives the emergence of the Virtual Power Plant (VPP) paradigm. A VPP aggregates distributed energy resources while operating as a conventional power plant. In recent years, several renewable energy sources have been installed in the commercial/industrial/residential building sector and they lend themselves for possible aggregation within the VPP operations. At present, building-side energy resources are usually managed by building energy management systems (BEMSs) with autonomous objectives and policies, and they are usually not setup to be directly controlled for the implementation of a VPP energy management system. This article presents a Building VPP (BVPP) architecture that aggregates building-side energy resources through the communication between the VPP energy management system and autonomous BEMSs. The implementation technologies, key components, and operation modes of BVPPs are discussed. Case studies are reported to demonstrate the effectiveness of BVPP in different operational conditions.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.