Papers
Topics
Authors
Recent
Search
2000 character limit reached

Dynamic lot size MIPs for multiple products and ELSPs with shortages, capacity and changeover limits

Published 6 Apr 2020 in math.OC | (2004.02740v1)

Abstract: Scheduling multiple products with limited resources and varying demands remain a critical challenge for many industries. This work presents mixed integer programs (MIPs) that solve the Economic Lot Sizing Problem (ELSP) and other Dynamic Lot-Sizing (DLS) models with multiple items. DLS systems are classified, extended and formulated as MIPs. Especially, logical constraints are a key ingredient in succeeding in this endeavour. They were used to formulate the setup/changeover of items in the production line. Minimising the holding, shortage and setup costs is the primary objective for ELSPs. This is achieved by finding an optimal production schedule taking into account the limited manufacturing capacity. Case studies for a production plants are used to demonstrate the functionality of the MIPs. Optimal DLS and ELSP solutions are given for a set of test-instances. Insights into the runtime and solution quality are given.

Authors (1)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.