Papers
Topics
Authors
Recent
2000 character limit reached

A hybrid optimization procedure for solving a tire curing scheduling problem

Published 29 Mar 2020 in cs.AI | (2004.00425v1)

Abstract: This paper addresses a lot-sizing and scheduling problem variant arising from the study of the curing process of a tire factory. The aim is to find the minimum makespan needed for producing enough tires to meet the demand requirements on time, considering the availability and compatibility of different resources involved. To solve this problem, we suggest a hybrid approach that consists in first applying a heuristic to obtain an estimated value of the makespan and then solving a mathematical model to determine the minimum value. We note that the size of the model (number of variables and constraints) depends significantly on the estimated makespan. Extensive numerical experiments over different instances based on real data are presented to evaluate the effectiveness of the hybrid procedure proposed. From the results obtained we can note that the hybrid approach is able to achieve the optimal makespan for many of the instances, even large ones, since the results provided by the heuristic allow to reduce significantly the size of the mathematical model.

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.