Papers
Topics
Authors
Recent
Search
2000 character limit reached

Acquisition of Project-Specific Assets with Bayesian Updating

Published 14 Jan 2019 in math.OC and q-fin.MF | (1901.04120v1)

Abstract: We study the impact of learning on the optimal policy and the time-to-decision in an infinite-horizon Bayesian sequential decision model with two irreversible alternatives, exit and expansion. In our model, a firm undertakes a small-scale pilot project so as to learn, via Bayesian updating, about the project\textquoteright s profitability, which is known to be in one of two possible states. The firm continuously observes the project\textquoteright s cumulative profit, but the true state of the profitability is not immediately revealed because of the inherent noise in the profit stream. The firm bases its exit or expansion decision on the posterior probability distribution of the profitability. The optimal policy is characterized by a pair of thresholds for the posterior probability. We find that the time-to-decision does not necessarily have a monotonic relation with the arrival rate of new information.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.