Papers
Topics
Authors
Recent
2000 character limit reached

Resource constrained shortest path algorithm for EDF short-term thermal production planning problem (1809.00548v1)

Published 3 Sep 2018 in math.OC

Abstract: Unit commitment problem on an electricity network consists in choosing the production plan of the plants (units) of a company in order to meet demand constraints. It is generally solved using a decomposition approach where demand constraints are relaxed, resulting in one pricing subproblem for each unit. In this paper we focus on the pricing subproblem for thermal units at EDF, a major French electricity producer. Our objective is to determine an optimal two-day production plan that minimizes the overall cost while respecting several non-linear operational constraints. The pricing problem is generally solved by dynamic programming. However, due to the curse of dimensionality, dynamic programming reaches its limits when extra-constraints have to be enforced. We model the subproblem as a resource constrained shortest path (RCSP) problem. Leveraging on RCSP algorithms recently introduced by the second author, we obtain an order of magnitude speed-up with respect to traditional RCSP algorithms.

Summary

We haven't generated a summary for this paper yet.

Whiteboard

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.