Papers
Topics
Authors
Recent
Search
2000 character limit reached

The prototyping/early construction phase of the BAIKAL-GVD project

Published 8 Aug 2013 in astro-ph.IM and astro-ph.HE | (1308.1833v1)

Abstract: The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises the first full-scale string of the GVD demonstration cluster has been deployed and operated during 2012. The first stage of the GVD demonstration cluster which consists of three strings is deployed in April 2013. We review the Prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.