Sharp minimax dependence on the bridge horizon
Determine the sharp minimax dependence of exact multivariate diffusion bridge sampling work on the time horizon, beyond the polynomial upper bound established for the proposed bridge sampler.
References
The sharp minimax dependence on the bridge horizon remains open and is a direction of future research.
— Exact Simulation of Multivariate Diffusions and Bridges
(2610.11330 - Blanchet et al., 8 Oct 2026) in Remark following Theorem 3.2, Section 3.3 (Minimax optimality)
The sharp joint dependence of bridge sampling work on the horizon and the number of requested observations remains open, as does the optimal dependence on the endpoints.
— Exact Simulation of Multivariate Diffusions and Bridges
(2610.11330 - Blanchet et al., 8 Oct 2026) in Section 4, Conclusions and discussions