FPTAS for the non-resumable two-machine open-shop problem
Determine whether the two-machine open-shop scheduling problem with a single fixed machine-unavailability interval in the non-resumable setting admits a fully polynomial-time approximation scheme (FPTAS).
References
An interesting direction for future work is to determine whether the corresponding non-resumable problem also admits an FPTAS.
— An FPTAS for Two-Machine Open-Shop Scheduling with a Single Unavailability Interval
(2609.11693 - Lu et al., 10 Sep 2026) in Section Conclusion