Multi-zone threshold operator
Construct a threshold operator for the full nonautonomous multi-zone transport--renewal system that extends the reduced autonomous next-generation operator framework.
References
Several questions remain open. The most important are the construction of a multi-zone threshold operator and the verification of the semigroup hypothesis (Assumption~\ref{ass:r0_semigroup}) for the present transport--renewal structure.
— Rigorous Analysis of a Nonlocal Transport--Renewal System for Physiologically Structured Populations
(2609.00735 - Yu et al., 1 Sep 2026) in Section Discussion