PMF feasibility beyond the sampled proposal pool
Determine whether the Chicago-Hardship PMF requirements are feasible over the complete set of possible blocks, rather than only within the sparse sampled proposal pool.
References
This result establishes inadmissibility only inside the sparse proposal pool; we do not test PMF feasibility over the complete set of possible blocks.
— Freeze, Validate, Report: Auditing Urban Station Plans with Common Evidence
(2609.39064 - Teusch et al., 30 Sep 2026) in Section 6.4, subsection “Secondary PMF results, bounds, and pool ablation”