Papers
Topics
Authors
Recent
Detailed Answer
Quick Answer
Concise responses based on abstracts only
Detailed Answer
Well-researched responses based on abstracts and relevant paper content.
Custom Instructions Pro
Preferences or requirements that you'd like Emergent Mind to consider when generating responses
Gemini 2.5 Flash
Gemini 2.5 Flash 87 tok/s
Gemini 2.5 Pro 50 tok/s Pro
GPT-5 Medium 13 tok/s Pro
GPT-5 High 16 tok/s Pro
GPT-4o 98 tok/s Pro
GPT OSS 120B 472 tok/s Pro
Kimi K2 210 tok/s Pro
2000 character limit reached

Multi-criteria optimization and automated network restructuring to mitigate construction projects delays on-the-run (2206.09823v1)

Published 20 Jun 2022 in nlin.AO, cs.SY, and eess.SY

Abstract: Construction project management requires dynamic mitigation control ensuring the project's timely completion by a best fit for common purpose strategy for all stakeholders. Current mitigation approaches are usually performed by an iterative Monte Carlo (MC) analysis focussing on lowest-cost strategies which do not include (1) the project manager's goal-oriented behaviour, (2) automated network restructuring potential, and (3) multi-dimensional optimization criteria for best fitting mitigation strategies-criteria. Therefore, the development statement within this paper is to design a method and implementation tool that properly dissolves all the aforementioned shortcomings ensuring the project's completion date by finding the most effective and efficient mitigation strategy. To fulfill the purpose of this paper, the Mitigation Controller (MitC) has been developed using an integrative approach of non-linear optimization techniques, probabilistic Monte Carlo simulation, and preference function modeling. Compared to the conventional way of mitigating project delays. The developed MitC allows mitigating potential delays with the least negative consequences on several project criteria, such as cost, environmental impact, etc. The application of the model to the demonstrative case study shows the ability of the model to significantly increase the probability of completing the project in the given target duration. Embedding the multi-criteria evaluation in the optimization model ensures that other interests are also represented in finding the optimal strategy for project delays.

Citations (1)
List To Do Tasks Checklist Streamline Icon: https://streamlinehq.com

Collections

Sign up for free to add this paper to one or more collections.

Summary

We haven't generated a summary for this paper yet.

Ai Generate Text Spark Streamline Icon: https://streamlinehq.com

Paper Prompts

Sign up for free to create and run prompts on this paper using GPT-5.

Dice Question Streamline Icon: https://streamlinehq.com

Follow-up Questions

We haven't generated follow-up questions for this paper yet.