Approximation algorithms for the three-machine proportionate mixed shop scheduling

Published 15 Sep 2018 in cs.DS | (1809.05745v1)

Abstract: A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been studied since the 1980's. We consider the three machine proportionate mixed shop problem denoted as $M3 \mid prpt \mid C_{\max}$, in which each job has equal processing times on all three machines. Koulamas and Kyparisis [{\it European Journal of Operational Research}, 243:70--74,2015] showed that the problem is solvable in polynomial time in some very special cases; for the non-solvable case, they proposed a $5/3$-approximation algorithm. In this paper, we present an improved $4/3$-approximation algorithm and show that this ratio of $4/3$ is asymptotically tight; when the largest job is a flow-shop job, we present a fully polynomial-time approximation scheme (FPTAS). On the negative side, while the $F3 \mid prpt \mid C_{\max}$ problem is polynomial-time solvable, we show an interesting hardness result that adding one open-shop job to the job set makes the problem NP-hard if this open-shop job is larger than any flow-shop job. We are able to design an FPTAS for this special case too.

Citations (6)

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.