Papers
Topics
Authors
Recent
Gemini 2.5 Flash
Gemini 2.5 Flash
97 tokens/sec
GPT-4o
53 tokens/sec
Gemini 2.5 Pro Pro
44 tokens/sec
o3 Pro
5 tokens/sec
GPT-4.1 Pro
47 tokens/sec
DeepSeek R1 via Azure Pro
28 tokens/sec
2000 character limit reached

Inspection and Test Process Integration Based on Explicit Test Prioritization Strategies (1311.6264v1)

Published 25 Nov 2013 in cs.SE

Abstract: Today's software quality assurance techniques are often applied in isolation. Consequently, synergies resulting from systematically integrating different quality assurance activities are often not exploited. Such combinations promise benefits, such as a reduction in quality assurance effort or higher defect detection rates. The integration of inspection and testing, for instance, can be used to guide testing activities. For example, testing activities can be focused on defect-prone parts based upon inspection results. Existing approaches for predicting defect-prone parts do not make systematic use of the results from inspections. This article gives an overview of an integrated inspection and testing approach, and presents a preliminary case study aiming at verifying a study design for evaluating the approach. First results from this preliminary case study indicate that synergies resulting from the integration of inspection and testing might exist, and show a trend that testing activities could be guided based on inspection results.

User Edit Pencil Streamline Icon: https://streamlinehq.com
Authors (4)
  1. Frank Elberzhager (12 papers)
  2. Alla Rosbach (1 paper)
  3. Jürgen Münch (63 papers)
  4. Robert Eschbach (2 papers)
Citations (3)

Summary

We haven't generated a summary for this paper yet.